Logistics and Supply Chain Optimization for Midstream Pipelines

Strategic optimization of KMG’s pipeline supply network. Reduced delivery delays from 45 to 7 days and fortified 500 km of infrastructure against corrosion, ensuring uninterrupted crude transport.
KazMunayGas
Location:
Atyrau Region, Caspian Coast, Kazakhstan
Year:
2023
Partners:

National energy security depends on the integrity of midstream infrastructure. NOVABOLT was engaged by KazMunayGas (KMG) to optimize the supply chain and maintenance protocols for the critical pipeline network running from Atyrau to the Caspian Sea. The primary objective was to eliminate supply bottlenecks that were delaying urgent repairs on corrosive soil sections.

Utilizing our warehousing hub in Ajman, UAE, we completely restructured the logistics framework, slashing material delivery times from 45 days down to just 7. We supplied specialized modular repair kits and incorporated sustainable composite materials, which helped reduce the project’s carbon footprint by 12%. Beyond hardware, we invested in human capital, providing specialized technical training for over 200 field technicians to ensure long-term operational resilience.